24/7
The expected service life is at least 5 years
The maximum annual downtime is 100 hours
The maintenance cycle of the reactor tube is scattered across multiple maintenance intervals or process connections (once every three months).
The temperature in the core area is 1200°C
The heating stage lasts until the core area temperature reaches the target temperature for less than 120 minutes
The power required to maintain the temperature in the core area is less than 300 watts
The heat extraction reaction tube is continuously carried out through a constant air flow of 30 liters per hour inside - approximately 5 watts
Intermittent thermal extraction is carried out by injecting and evaporating aqueous solutions
Inject up to 2 milliliters of water sample into the reaction tube every 6 minutes - approximately 50 watts